Projects

Brunei Methanol Plant Sta 2011/13/15

Client:

Brunei Methanol Company

Duration of Construction:

Apr 11 / 13 / 15

SCOPE

  • Rotating Equipment
  • Static Equipment
  • Structural Steel & Piping
  • Refractory
  • Control Valves & PSV
  • Blasting & Painting
  • Insulation & Scaffolding
  • Catalyst Change-Out
  • Reformer Tube Installation
  • E&I